A new heuristic solution method in resource-constrained project scheduling

Author(s):  
Colin E. Bell ◽  
Jaemin Han
2016 ◽  
Vol 5 (4) ◽  
pp. 1-15 ◽  
Author(s):  
Hossein Zoulfaghari ◽  
Javad Nematian ◽  
Amir Abbas Kanani Nezhad

This paper is about the Resource-Constrained Project Scheduling Problem) RCPSP) which is one of the most important problems in last three decades and many researchers have paid attention to it and have reached useful results. In this paper, to cope with uncertainty issue, the RCPSP is studied under fuzzy environment where activity times are assumed to be fuzzy numbers. For this problem with fuzzy numbers as activity times, a linear mathematical programming model is presented. The objective function of the model is minimizing the completion time of project. Since the activity times are fuzzy numbers, finish time is also a fuzzy number. Hence, the model is transformed to a crisp multi-objective linear programming model. To illustrate the solution method, a numerical example is solved under both fuzzy and crisp environment and the results are compared. To prove the efficiency of the proposed method the results of the proposed solution method, some benchmark problems obtained from PSPLIB are utilized.


2022 ◽  
Vol 7 (2) ◽  
pp. 95-110 ◽  
Author(s):  
Amir Golab ◽  
Ehsan Sedgh Gooya ◽  
Ayman Al Falou ◽  
Mikael Cabon

This paper is concerned with an overview of the Resource-Constrained Project Scheduling Problem (RCPSP) and the conventional meta-heuristic solution techniques that have attracted the attention of many researchers in the field. Therefore, researchers have developed algorithms and methods to solve the problem. This paper addresses the single-mode RCPSP where the objective is to optimize and minimize the project duration while the quantities of resources are constrained during the project execution. In this problem, resource constraints and precedence relationships between activities are known to be the most important constraints for project scheduling. In this context, the standard RCPSP is presented. Then, the classifications of the collected papers according to the year of publication and the different meta-heuristic approaches applied are presented. Five weighted articles and their meta-heuristic techniques developed for RCPSP are described in detail and their results are summarized in the corresponding tables. In addition, researchers have developed various conventional meta-heuristic algorithms such as genetic algorithms, particle swarm optimization, ant colony optimization, bee colony optimization, simulated annealing, evolutionary algorithms, and so on. It is stated that genetic algorithms are more popular among researchers than other meta-heuristics. For this reason, the various conventional meta-heuristics and their corresponding articles are also presented to give an overview of the conventional meta-heuristic optimizing techniques. Finally, the challenges of the conventional meta-heuristics are explored, which may be helpful for future studies to apply new suitable techniques to solve the Resource-Constrained Project Scheduling Problem (RCPSP).


Sign in / Sign up

Export Citation Format

Share Document